ERC imposes power market share limits for 2026

3 months ago 50
Suniway Group of Companies Inc.

Upgrade to High-Speed Internet for only ₱1499/month!

Enjoy up to 100 Mbps fiber broadband, perfect for browsing, streaming, and gaming.

Visit Suniway.ph to learn

MANILA, Philippines – Local power generation firms are not allowed to operate an energy portfolio exceeding 7.05 gigawatts nationwide, as energy regulators have reduced the allowable installed capacity for 2026. For this year, the Energy Regulatory Commission (ERC) said the national grid’s maximum installed generating capacity was 28,197.05 megawatts (MW), down slightly from last year’s 28,390.07
Read Entire Article